Aggie Square's Construction Calendar, for Buyers Looking at Elmhurst

Aggie Square opened across Stockton Boulevard from Elmhurst on May 2, 2025. Within a year it had labs, classrooms, a public lounge and a six-story apartment building. Many of the bigger changes next to Elmhurst haven't happened yet. A lab building is paused until enough of its space is pre-leased. A Stockton Boulevard transit project that is weighing bus rapid transit is only now heading into environmental review. UC Davis Health's new hospital tower is set to open to patients in 2030. If you're comparing a home in Elmhurst with one north of Highway 50 in East Sacramento, the useful question is which parts of the campus are already there and which are still dates on a calendar.

Elmhurst is the closest neighborhood to all of it. The City of Sacramento's directory gives the Elmhurst Neighborhood Association's boundaries as Highway 50 on the north, V Street and 2nd Avenue on the south, 57th Street on the east and Stockton Boulevard on the west. The western edge of Elmhurst is the street Aggie Square fronts.

What has opened across Stockton Boulevard

The first phase was billed as 767,000 square feet of research space, classrooms, community space, housing and parking. Wexford's Connect Labs opened first, in March 2025. It has 50,000 square feet of lab and office space for startups. At the formal opening that May, UC Davis Health named its first university tenants. They were the Wang Lab, a biomedical engineering master's program in medical device development, a research hub for the Comprehensive Cancer Center, and the National Center for Interventional Biophotonic Technologies.

Private tenants have kept arriving. In February 2026, UC Davis reported that GABRiC USA, ULI Sacramento, Capitol Impact, Intellivasc, CAGED, Growth Factory, Elyxir and Investorfy had joined Connect Labs. The same update put UC Davis students and researchers at about 60 percent of Aggie Square's occupancy. It also counted more than 400 events and over 13,500 attendees between the May 2025 opening and that February. A June 30, 2026 update added Valley Vision, Tendel Therapies and Xironetic.

The part a neighbor would actually use is the Civic Lounge at 300 Aggie Square. UC Davis describes it as a gathering place for faculty, staff, students and the community. The first community benefits progress report, released April 2, 2026, notes that the public has access and that some venue fees have been discounted or waived.

The campus already has a large employer next door. UC Davis Health lists 16,218 staff on its facts and figures page, using a 2026 snapshot. That figure covers the whole health system, not only the Sacramento campus. Still, it shows how many people already have a reason to live within walking or biking distance of Stockton Boulevard.

The first new homes were rentals

The only housing in the first phase is ANOVA Aggie Square, a six-story building with 190 apartments and 252 beds. It held its grand opening on June 27, 2025. UC Davis Student Housing master-leases 49 of those apartments, with 103 beds, at below-market rates. GMH leases the rest to the public, and UC Davis affiliates get priority. According to the ANOVA FAQ, residents' garage parking is limited, not guaranteed and assigned by lottery.

For an Elmhurst buyer, that means new tenants in the first phase got rental housing. Someone who takes a job at Connect Labs or one of the university programs has a new apartment option across the street. A resale house in Elmhurst or East Sacramento is a separate decision, made by people who plan to stay longer.

What comes later

The rest of the project runs on a longer schedule. Each item below has its own timing, and some depend on leasing or funding.

Project Where it stands Timing
400 Aggie Square Built as part of Phase 1a; specialized interior work remained as of spring 2026 UC Davis Veterinary Genetics Laboratory scheduled to move in late 2026 or early 2027
100 Aggie Square Construction paused until preleasing milestones are met No fixed date
Aggie Square Phase 2 About 600,000 more square feet of research, offices, housing and community services No delivery dates published
California Tower, UC Davis Health Structural topping-out on Feb. 6, 2026 Opening to patients in 2030
Stockton Boulevard Safety and Transit Enhancement Project SacRT approved the locally preferred alternative on Aug. 24, 2026; moving into environmental review No construction date set

The Commercial Real Estate Development Association's spring 2026 account says the pandemic led the partners to resequence Phase 1 to match leasing conditions. When 100 Aggie Square goes ahead, it will be a mirror-image companion to the 200 Aggie Square East tower. UC Davis projects 3,200 permanent jobs once Aggie Square is complete. That's a projection for the finished campus, not a count of people working there today.

The California Tower has the clearest date of anything on the list. It's a 14-story hospital with a five-story pavilion, about one million square feet in all, and it will add roughly 334 beds when it opens to patients in 2030. If you buy in Elmhurst this winter, construction on that campus is scheduled to continue for most of your first four years there.

The City's Stockton Boulevard project page lists Route 51 bus rapid transit, upgraded stops, lighting, pedestrian crossings, bike facilities and traffic calming among the possible improvements. That's the change most likely to affect the western edge of Elmhurst day to day, and the project is only now moving into environmental review.

The houses in Elmhurst

On the residential side of Stockton Boulevard, the housing was built a century ago. A historic resources analysis prepared for the City's Stockton Boulevard plan in August 2023 describes Elmhurst along T Street, between Stockton Boulevard and roughly 53rd Street, as "a cohesive grouping of early 20th century houses arranged around a wide boulevard with two parks forming a landscaped central median." The same report points to Colonial Heights, a nearby neighborhood also planned around a landscaped boulevard. Its San Francisco Boulevard, between Stockton Boulevard and 55th Street, was found eligible for both the Sacramento Register and the California Register in a 2013 evaluation.

The Elmhurst Neighborhood Association meets at the Coloma Community Center, 4623 T Street, on the same boulevard. If you want to hear how residents are discussing the Stockton Boulevard plan before you buy, a meeting there is the place to go.

The Elmhurst houses are already built and won't change, while the campus next to them is still in its first phase. A buyer who chooses T Street for its walk to a campus job is getting the walk now and the rest of the campus over the following years.

East Sacramento's numbers this fall

For a buyer comparing Elmhurst with East Sacramento north of Highway 50, MetroList's East Sacramento & Vicinity area 10819 recorded 22 closed residential sales in September 2026. The average close price was $907,575, homes closed at an average of 101.46 percent of list price, and the average time on market was 22 days, according to the Sacramento Association of REALTORS area report. Across Sacramento County in October 2026, the median sold price was $530,000, homes averaged 36 days on market, and the sold-to-original-list ratio was 97 percent, according to SAR's October report.

Those September figures describe contracts signed late in the summer. In an October 28 post, Sacramento appraiser Ryan Lundquist wrote that the region had lost about 15 to 20 percent of buyer demand in recent months. He called closed prices "the caboose" in the train of real estate data, because a market shift appears in listings first and in sales a few months later. With fewer buyers this fall, the ones still shopping have more time to compare a house next to the campus with one farther away.

On the East Sacramento side of Highway 50, most of what you see is already finished: the established streets, McKinley Park, Folsom Boulevard. In Elmhurst you're also choosing a neighbor that will keep changing. Its labs, apartments and public lounge are open. The next lab tenant was scheduled to move in late 2026 or early 2027, and the transit plan and the hospital tower come after that. If you're thinking about how prices near the campus may move, our post on the conforming loan limit in East Sacramento covers how financing splits buyers in that price range. The East Sacramento neighborhood page covers the blocks north of the freeway.

Quick answers

Is Aggie Square open to people who don't work there?

Yes. UC Davis describes the Civic Lounge at 300 Aggie Square as a gathering place for the community as well as faculty, staff and students. The April 2026 progress report records public access and some discounted or waived venue fees.

When does the California Tower open?

UC Davis Health says the tower and pavilion will open to patients in 2030.

Can the public rent at ANOVA Aggie Square?

Yes. UC Davis master-leases 49 of the 190 apartments for students. GMH leases the rest to the public, with priority for UC Davis affiliates.

If you're deciding between a house on Elmhurst's T Street boulevard and one north of Highway 50, bring the Aggie Square and California Tower dates to a conversation with Pierre about how long you plan to stay. Work with Pierre at Caviard Realty Associates and request a neighborhood consultation.